top of page

Ghana Financial System Control Center Project


KESINO CONTROL CONSOLES
KESINO CONTROL CONSOLES

Since receiving the request from the technical engineer of project of Ghana, the engineers of Kesino design, R&D, and other departments have analyzed the technical points raised by the customer to ensure the accuracy of each product detail.


After two months of work and trial installation services, China Henan Kesino Super Factory delivered more than 40 seats of professional control center consoles and provided professional installation details and technical notes, which were shipped to Ghana's docks by freighter. 


The detailed picture of the installation control center console product and the picture of the overall control center status that the customer feedback to us.

 
 
 

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page